|
|
M1 Garand Services
Due to the varying condition, complexity and age of many of the rifles we receive, and, the comprehensive nature and personal attention of our technical inspection process, please allow a minimum of 12 weeks for completion of most service work. Urgent service needs can often be accommodated in 30 days with prior approval.
| Technical Inspection
|
$79.95, Plus Return Shipping
|
We start with our acclaimed, exclusive, & comprehensive Tech Inspection when your rifle arrives- where we completely disassemble, inspect, and gauge each component, consult with you on any work to be done, then clean, assemble, lubricate and test fire your rifle. The TI is the foundation for all the work we’ll do on your rifle. The TI ensures the function and safety of your rifle upon its return to you. Include a daytime phone number with area code so we may discuss our findings with you.
|
|
Metal Refinishing
Clean, Degrease, Bead Blast Metal Parts And Parkerize With Maganese Phosphate, Stainless Steel Parts Will Be Swapped For Already Blackened Parts. (We Do Not Offer Aluminum Re-Finishing).
|
| Bead Blast Metal Parts And Parkerize With Maganese Phosphate
|
Add $175.00
|
|
Barrel Installation
Supply, Fit, Headspace, Polish, Precisely Index & Install:
|
| FA, 24”, GI Contour, 1x10, NM Quality, .30-06
|
Add $275.00
|
| —with Chrome-Lined Bore & Chamber, .308 Win. or .30-06, Pls. Specify
|
Add $345.00
|
| FA, 18.25”, Tanker Contour, 1x10, NM Quality, .308 Win. or .30-06, Pls. Specify
|
Add $325.00
|
| —with Chrome-Lined Bore & Chamber, .308 Win. or .30-06, Pls. Specify
|
Add $400.00
|
|
Krieger, 24”, GI Contour, 1 x 10, NM Quality, 30-06 or .308, Pls. Specify
|
Add $500.00
|
| Krieger, 24”, Heavy Weight, 1 x 10, NM Quality, 30-06 or .308, Pls. Specify
|
Add $525.00
|
| For Magazine Filler Block for .308 Barrel Installations
|
Add $25.00
|
|
Barrel Modifications
|
| Recrown Muzzle
|
Add $35.00
|
| Remove Barrel, Polish Chamber & Ramps, Precisely Re-Index & Re-Install
|
Add $75.00
|
|
Fulton Armory Stocks and Handguards
Supply, Fit, Sand, Hand Rub w/Linseed Oil and Install New M1Garand Stock with Customer- Supplied Stock Hardware (Includes Stock and Handguards, No Hardware)
|
| Walnut Stock and Handguards, Hand Selected For Beauty & Color/Grain Match
|
Add $230.00
|
| Brown Laminated Birch Stock and Handguards, Eurothane Finish
|
Add $255.00
|
| —Add for New Stock Hardware, Installed
|
Add $85.00
|
|
National Match And Performance Modifications
Supply, Fit and Install:
|
|
Accurizing Service: Remove Spacer, Loctite & Epoxy Front Handguard Hardware, Knurl & Loctite Lower Band to Barrel
|
Add $25.00
|
| FA Super Scout Picatinny Rail Handguard
|
Add $165.00
|
| —Add Accessory Rail for Super Scout Handguard, Each
|
Add $20.00
|
| Rear Sight Elevation Disk
|
Add $45.00
|
| NM Rear Sight Aperture
|
Add $50.00
|
| NM Front Sight
|
Add $30.00
|
| NM Trigger Modification to Customer Trigger Group (+ Return Shipping)
|
Add $65.00
|
| New M1 Garand Build on Your USGI Receiver
|
$250 Credit
|
| REMINDER
|
|
Please include the following information (legible please) with your firearm:
*First and Last Name
*Full Return Address (ONLY street address accepted) where you want your firearm returned
*Daytime Phone w/Area Code
*List services you would like and/or any malfunctions or issues
*Do Not forget to insure your package.
|
|
Important Shipping Info:
- Please include your ENTIRE RIFLE along with a sample of your commonly used en bloc clips
- DO NOT SHIP YOUR RIFLE IN A RIFLE CASE, it is neither discreet nor secure, ship your rifle in a properly packed cardboard shipping box. We offer our own rifle boxes for sale in the "Accessories" section but they are not required. Any rifle case we receive will be returned to you at your expense.
- It is illegal to ship ammunition and firearm in the same container. Please make sure the firearm is NOT loaded prior to shipping.
- We cannot accept a firearm sent in for service without a serial number & manufacturer or with a non-legible serial number or manufacturer. It will be returned to you without service at your expense.
Thank You In Advance For Your Cooperation
|
|
|